Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 29, 2018, 08:32 AM
  • 01 0266B_01 0266A_29052018_014230.mp4

Date
05/29/2018
W/O
707007
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00218
PipeID
P01314
Time
1:32 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5176
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
WO_707007_TV01204_JUN2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
01 0266B
Downstream MH
01 0266A
Dir. of Survey
Downstream
Length Surveyed
149.2 ft.
Total Length
149.2 ft.
Structural Index
4
Structural Quick
4200
Structural Rating
8
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 01 0266B to 01 0266A
MH: 01 0266BMH: 01 0266Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 0266B0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH1.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start54 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - UNKNOWN, OPERATOR DID NOT STOP TO LOOK AT CONN.87 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - UNKNOWN, OPERATOR DID NOT STOP TO LOOK AT CONN.114.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"126.3 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"147.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish147.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"147.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish149.2 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH149.2 ft. AMH - Downstream Manhole, Survey Ends - 01 0266A

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    1.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
149.2MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
147.2FM
2.8FM
0AMH01 0266B
149.2AMH01 0266A
147.2TFC
147.2DAGS
0MWL
0MWM
1.2DAGS
126.3TB
114.7TF
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
87TFUNKNOWN, OPERATOR DID NOT STOP TO LOOK AT CONN.
54TFUNKNOWN, OPERATOR DID NOT STOP TO LOOK AT CONN.

Properties (4)

additional_info
SC355097
custom_field_two
2
customer
LACSD
datetime
2018-05-29T01:32:12-07:00