Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 31, 2018, 10:45 AM
  • 14 0424_14 0423 _31052018_035415.mp4

Date
05/31/2018
W/O
701348
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18508
Time
3:45 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5715
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
12
Purpose
Routine Assessment
Project
WO_701348_TV14019_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0424
Downstream MH
14 0423
Dir. of Survey
Downstream
Length Surveyed
181.9 ft.
Total Length
181.9 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
180
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
188
Pipe schematic from manhole 14 0424 to 14 0423
MH: 14 0424MH: 14 0423downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - FLOW METER0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04242 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start31.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"60 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"84.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"108.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"132.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"156.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"179.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish179.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish179.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish181.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0423181.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • General Observation - FLOW METER

    0 ft. - General Observation - FLOW METER

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
60TFC
2SSS
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
181.9AMH14 0423
179.9SAP
132.4TFC
0MWL
31.4TFC
181.9MGOACTIVE CONNECTION AT MH 9 O'CLOCK
156.6TFC
0MGOFLOW METER
2DAGS
0MWM
2SAP
179.9DAGS
179.9SSS
84.3TFC
0AMH14 0424
108.3TFC