Wastewater/Activity/PacpInspection/1.0Jun 1, 2018, 07:56 AM
  • 14 0419_14 0418 _01062018_010811.mp4

Date
06/01/2018
W/O
701348
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18502
Time
12:56 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5716
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
07
Purpose
Routine Assessment
Project
WO_701348_TV14019_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0419
Downstream MH
14 0418
Dir. of Survey
Downstream
Length Surveyed
310.2 ft.
Total Length
310.2 ft.
Structural Index
3
Structural Quick
5K3K
Structural Rating
610
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
616
Pipe schematic from manhole 14 0419 to 14 0418
MH: 14 0419MH: 14 0418downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04190 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 35% MMAG2 ft. SMW - Surface Missing Wall, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start19.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"43.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"67.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"92 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"119.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"144.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"168.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"192.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"216.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"244.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"269.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"293.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"308.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish308.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish308.2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 35% MAG308.2 ft. SMW - Surface Missing Wall, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish308.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish310.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0418

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (27)

DistanceCodeObservation
293.2TFC
216.9TFC
2.6SAP
0AMH14 0419
244.8TFC
308.2DAGS
2SZ35% MMAG
0MWM
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
19.2TFC
2SMW
92TFC
2.6DAGS
308.2SAP
3.1SSS
192.4TFC
168.1TFC
43.3TFC
119.5TFC
308.2SZ35% MAG
308.2SMW
67.9TFC
269.3TFC
144.2TFC
310.2AMH14 0418
0MWL
308.2SSS

Properties (4)

additional_info
SC359382
custom_field_two
2
customer
LACSD
datetime