Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 30, 2018, 10:35 AM
  • 14 0429_14 0428 _30052018_035335.mp4

Date
05/30/2018
W/O
701348
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18513
Time
3:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5712
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
12
Purpose
Routine Assessment
Project
WO_701348_TV14019_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0429
Downstream MH
14 0428
Dir. of Survey
Downstream
Length Surveyed
366.8 ft.
Total Length
366.8 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
365
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
369
Pipe schematic from manhole 14 0429 to 14 0428
MH: 14 0429MH: 14 0428downstream0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04292 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"30 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIS39.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"67.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"92.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"117 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"141.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"166 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"189.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"218.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"242.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"267 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"291.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"315.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"366.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish366.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish366.8 ft. AMH - Downstream Manhole, Survey Ends - 14 0428366.8 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 11 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  25 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES - DEBRIS

    30 ft. - Deposits Settled Other, 25 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIS

Observations (22)

DistanceCodeObservation
30DSZDEBRIS
366.8SSS
218.3TFC
166TFC
366.8SAP
117TFC
15TFC
2SAP
0MWL
67.7TFC
267TFC
315.4TFC
366.8AMH14 0428
291.1TFC
242.4TFC
141.2TFC
2SSS
39.2TFC
0AMH14 0429
366.8MGOACTIVE CONNECTION AT MH 11 O'CLOCK
92.3TFC
189.5TFC

Properties (4)

additional_info
SC359378
custom_field_two
2
customer
LACSD
datetime
2018-05-30T03:35:47-07:00