Wastewater/Activity/PacpInspection/1.0May 30, 2018, 07:17 AM
  • 14 0433A_14 0433 _30052018_002352.mp4

Date
05/30/2018
W/O
701348
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18519
Time
12:17 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5712
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
12
Purpose
Routine Assessment
Project
WO_701348_TV14019_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0433A
Downstream MH
14 0433
Dir. of Survey
Downstream
Length Surveyed
94.7 ft.
Total Length
94.7 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
90
O&M Index
2
O&M Quick
412C
O&M Rating
40
Overall Index
2
Overall Quick
Overall Rating
130
Pipe schematic from manhole 14 0433A to 14 0433
MH: 14 0433AMH: 14 0433downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0433A2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start8.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"33.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"57.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"81.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"92.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish92.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish92.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish94.7 ft. AMH - Downstream Manhole, Survey Ends - 14 0433

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2SAP
92.8SSS
0MWL
92.8DAGS
0MWM
2SSS
0AMH14 0433A
94.7AMH14 0433
2DAGS
33.2TFC
57.4TFC
92.8SAP
81.7TFC
8.7TFC

Properties (4)

additional_info
SC359378
custom_field_two
2
customer
LACSD
datetime
2018-05-30T00:17:16-07:00