Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 30, 2018, 09:39 AM
  • 14 0431_14 0430 _30052018_025636.mp4

Date
05/30/2018
W/O
701348
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18515
Time
2:39 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5712
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
12
Purpose
Routine Assessment
Project
WO_701348_TV14019_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0431
Downstream MH
14 0430
Dir. of Survey
Downstream
Length Surveyed
326.4 ft.
Total Length
326.4 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
412L
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
459
Pipe schematic from manhole 14 0431 to 14 0430
MH: 14 0431MH: 14 0430downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04312 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start32.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"52.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"77 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"105.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"129.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"154.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"179 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"207.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"232.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"256.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"280.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"305.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"324.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish324.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish324.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish326.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK326.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0430

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
305.3TFC
207.5TFC
324.8SSS
326.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
280.5TFC
52.6TFC
326.4AMH14 0430
256.4TFC
77TFC
0MWM
324.8SAP
154.1TFC
129.7TFC
324.8DAGS
2SSS
232.1TFC
2SAP
179TFC
0MWL
0AMH14 0431
32.3TFC
2DAGS
105.4TFC

Properties (4)

additional_info
SC359378
custom_field_two
2
customer
LACSD
datetime
2018-05-30T02:39:38-07:00