Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 14, 2018, 09:05 AM
  • 18 1182_18 0719 _14052018_021716.mp4

Date
05/14/2018
W/O
701125
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00706
PipeID
P14572
Time
2:05 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5319
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
WO_701125_TV18104_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
18 1182
Downstream MH
18 0719
Dir. of Survey
Downstream
Length Surveyed
253.4 ft.
Total Length
253.4 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 18 1182 to 18 0719
MH: 18 1182MH: 18 0719downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 11820.1 ft. MWM - Water Mark, 50 %of cross sectional area9.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING start9.9 ft. SAP - Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: YES11 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"25.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start249.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish249.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish253.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0719

Observation photos (2)

  • Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: YES

    9.9 ft. - Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    25.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
249.9SAP
11TF
249.9MGOMAGNEZIUM H.O COATING finish
0MWL
253.4AMH18 0719
9.9MGOMAGNEZIUM H.O COATING start
0.1MWM
9.9SAP
0AMH18 1182
25.6SAP

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-05-14T02:05:05-07:00