Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2018, 08:08 AM
  • 18 0736_18 0735 _10052018_011440.mp4

Date
05/10/2018
W/O
701125
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00706
PipeID
P14589
Time
1:08 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5317
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_701125_TV18104_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0736
Downstream MH
18 0735
Dir. of Survey
Downstream
Length Surveyed
144.5 ft.
Total Length
144.5 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 18 0736 to 18 0735
MH: 18 0736MH: 18 0735downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07360 ft. MWM - Water Mark, 55 %of cross sectional area26.5 ft. MGO - General Observation - MAGNEZIUM H.O COATING start59.6 ft. SAP - Surface Aggregate Projecting, from 09 to 11 o'clock, within 8 inches of joint: YES75 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start125 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"142.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish142.1 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish144.4 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH144.5 ft. AMH - Downstream Manhole, Survey Ends - 18 0735

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 11 o'clock, within 8 inches of joint: YES

    59.6 ft. - Surface Aggregate Projecting, from 09 to 11 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    75 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
142.1SAP
0MWL
142.1MGOMAGNEZIUM H.O COATING finish
144.5AMH18 0735
144.4MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
0AMH18 0736
125TFA
0MWM
59.6SAP
75SAP
26.5MGOMAGNEZIUM H.O COATING start

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-05-10T01:08:18-07:00