Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2018, 08:01 AM
  • 18 0737_18 0736 _10052018_010652.mp4

Date
05/10/2018
W/O
701125
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00706
PipeID
P14590
Time
1:01 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5317
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_701125_TV18104_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0737
Downstream MH
18 0736
Dir. of Survey
Downstream
Length Surveyed
100.3 ft.
Total Length
100.3 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 18 0737 to 18 0736
MH: 18 0737MH: 18 0736downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07370 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH12 ft. MGO - General Observation - MAGNEZIUM H.O COATING start71.2 ft. SAP - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES80.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start97.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish97.7 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish100.3 ft. AMH - Downstream Manhole, Survey Ends - 18 0736

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES

    71.2 ft. - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    80.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
80.5SAP
0MWL
0MWM
97.7MGOMAGNEZIUM H.O COATING finish
100.3AMH18 0736
0AMH18 0737
12MGOMAGNEZIUM H.O COATING start
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
71.2SAP
97.6SAP

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-05-10T01:01:21-07:00