Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 14, 2018, 09:18 AM
  • 18 0719_18 0718 _14052018_023642.mp4

Date
05/14/2018
W/O
701125
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00706
PipeID
P14571
Time
2:18 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5319
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
WO_701125_TV18104_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
18 0719
Downstream MH
18 0718
Dir. of Survey
Downstream
Length Surveyed
404.9 ft.
Total Length
404.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 18 0719 to 18 0718
MH: 18 0719MH: 18 0718downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07190 ft. MWM - Water Mark, 50 %of cross sectional area5.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.4 ft. MGO - General Observation - MAGNEZIUM H.O COATING start61.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"120.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"135.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"296.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"297.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"399.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish399.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish404.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0718

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
5.3SAP
0MWL
120.5TFA
399.8SAP
61.9TF
135.6TFA
297.7TFA
0AMH18 0719
399.9MGOMAGNEZIUM H.O COATING finish
5.4MGOMAGNEZIUM H.O COATING start
296.8TFA
0MWM
404.9AMH18 0718