Wastewater/Activity/PacpInspection/1.0Jun 13, 2018, 08:09 PM
  • Section#10_30 0030A_30 0029__6132018__I0026.mp4

Date
06/13/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P25928
Time
1:09 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0026
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
HERMOSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
20180608DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
30 0029
Downstream MH
30 0028A
Dir. of Survey
Downstream
Length Surveyed
36 ft.
Total Length
36 ft.
Structural Index
3
Structural Quick
3A26
Structural Rating
45
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
45
Pipe schematic from manhole 30 0029 to 30 0028A
MH: 30 0029MH: 30 0028Adownstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:11 PM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 50% MAG2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. MGP - General Photograph4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start20.5 ft. MGP - General Photograph30.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish30.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish30.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish30.3 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 50% MAG35.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE36 ft. AMH - Downstream Manhole, Survey Ends - 1:19 PM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    3.9 ft. - General Photograph

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    20.5 ft. - General Photograph

Observations (15)

DistanceCodeObservation
30.2SAV
0MWL
30.3SZ50% MAG
35.9MGOCONN @ MH 3 O'CLOCK/ACTIVE
20.5MGP
0AMH1:11 PM
2SSS
30.2SAP
4SAP
30.2SSS
0MWM
2SZ50% MAG
2SAV
3.9MGP
36AMH1:19 PM

Properties (4)

additional_info
PAPERWORK IS CORRECT. ON SCREEN DISPLAY IS WRONG.(THIS IS MH 0029 TO MH 0028A)
custom_field_two
3
customer
LACSD
datetime
2018-06-13T13:09:50-07:00