Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2018, 08:27 PM
  • Section#7_30 0046_30 0045__6112018__I0023.mp4

Date
06/11/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17749
Time
1:27 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0023
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
HERMOSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
20180608DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
30 0046
Downstream MH
30 0045
Dir. of Survey
Downstream
Length Surveyed
189.1 ft.
Total Length
189.1 ft.
Structural Index
3
Structural Quick
5C3F
Structural Rating
280
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
280
Pipe schematic from manhole 30 0046 to 30 0045
MH: 30 0046MH: 30 0045downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:28 PM0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG60 ft. MGP - General Photograph91.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start140.4 ft. MGP - General Photograph185.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish185.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish185.3 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 80% MAG185.3 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish189 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE189.1 ft. AMH - Downstream Manhole, Survey Ends - 1:41 PM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    60 ft. - General Photograph

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    91.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    140.4 ft. - General Photograph

Observations (15)

DistanceCodeObservation
185.3SZ80% MAG
91.6SRV
2SSS
189.1AMH1:41 PM
60MGP
0MWM
185.3SRV
189MGOCONN @ MH 3 O'CLOCK/ACTIVE
2SAP
140.4MGP
0AMH1:28 PM
185.1SSS
185.1SAP
2SZ80% MAG
0MWL

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-06-11T13:27:46-07:00