Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 4, 2018, 07:33 AM
  • 01 1205_01 1204_642018_004527.mp4

Date
06/04/2018
W/O
0708602
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00226
PipeID
P02116
Time
12:33 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0878R
Sewer Name
01 WILCOX AVENUE TRUNK, EXTENSION #1
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Maintenance Related
Project
20180604MDM_WILCOX_AVENUE_TRUNK_EXTENSION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
01 1204
Downstream MH
01 1205
Dir. of Survey
Upstream
Length Surveyed
348.5 ft.
Total Length
348.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
4121
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 01 1204 to 01 1205
MH: 01 1204MH: 01 1205upstream0 ft. AMH - Upstream Manhole, Survey Ends - 1:10AM30.6 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open30.6 ft. RFL - Roots Fine Lateral, at 11 o'clock - 3%60.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped130.1 ft. RFL - Roots Fine Lateral, at 10 o'clock - 3%130.8 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-60% ROOTS148.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open270.6 ft. MWM - Water Mark, 30 %of cross sectional area294.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped296.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped324.5 ft. MGO - General Observation - 15" VCP348.5 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active348.5 ft. MWL - Water Level, 10 %of cross sectional area348.5 ft. MWM - Water Mark, 60 %of cross sectional area348.5 ft. AMH - Downstream Manhole, Survey Begins - 12:45AM

Observation photos (2)

  • General Observation - 15" VCP

    24 ft. - General Observation - 15" VCP

  • Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-60% ROOTS

    217.7 ft. - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-60% ROOTS

Observations (15)

DistanceCodeObservation
54.3TFCCapped
0MGOConn. @ Mh, 3 O' Clock. Active
317.9TBOpen
51.6TFCCapped
199.6TFOpen
0MWL
217.7TFDOpen-60% ROOTS
317.9RFL3%
0MWM
24MGO15" VCP
348.5AMH1:10AM
0AMH12:45AM
77.9MWM
287.8TFCCapped
218.4RFL3%

Properties (3)

additional_info
REVERSE INSPECTION - POST ROOT EVALUATION ONLY
customer
LACSD
datetime
2018-06-04T00:33:10-07:00