C 0210_C 0209_682018_025242.mp4
2 ft. - General Observation - MAG COAT 100% START 8:00 TO 4:00
20.2 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
26.6 ft. - Surface Spalling, from 08 to 01 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE
30.5 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - INDUSTRIAL WASTE
76.8 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
146.7 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
182.9 ft. - General Observation - SLIME COAT ON PIPE FROM HOT OILY SEWAGE
242.2 ft. - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 2:50AM |
| 48.8 | MGO | HOT SEWAGE SHUT OFF CAMERA |
| 308.6 | AMH | 4:30AM |
| 242.2 | SSS | PEELING CONCRETE |
| 308 | MGO | MAG COAT 70% FINISH |
| 182.9 | MGO | SLIME COAT ON PIPE FROM HOT OILY SEWAGE |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 146.7 | SSS | BLISTERING CONCRETE |
| 20.2 | SSS | BLISTERING CONCRETE |
| 76.8 | SSS | BLISTERING CONCRETE |
| 308 | SSS | BLISTERING PEELING CONCRETE |
| 48.8 | SSS | PEELING CONCRETE |
| 122.7 | DSZ | SLUDGE INDUSTRIAL WASTE |
| 71.8 | MGO | MAG COAT 70% START |
| 2 | MGO | MAG COAT 100% START 8:00 TO 4:00 |
| 0 | MWL | — |
| 308 | MGO | Conn. @ Mh, 9 O' Clock. Capped |
| 0 | MWM | — |
| 30.5 | DSZ | INDUSTRIAL WASTE |
| 26.6 | SSS | BLISTERING PEELING CONCRETE |