C 0211_C 0210_682018_020917.mp4
2 ft. - General Observation - MAG COAT 100% START 8:00 TO 4:00
16.6 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
35.3 ft. - Surface Spalling, from 03 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
68.4 ft. - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
78.8 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start - SLUDGE INDUSTRIAL WASTE
133.4 ft. - General Observation - MAG COAT 98% START
133.4 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE
262.6 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 16.6 | SSS | BLISTERING PEELING CONCRETE |
| 291.3 | DSZ | SLUDGE INDUSTRIAL WASTE |
| 133.4 | MGO | MAG COAT 98% START |
| 0 | AMH | 2:10AM |
| 262.6 | SSS | BLISTERING CONCRETE |
| 2 | MGO | MAG COAT 100% START 8:00 TO 4:00 |
| 0 | MWL | — |
| 2 | SSS | BLISTERIN PEELING CONCRETE UNDER MAG COAT |
| 35.3 | SSS | BLISTERING CONCRETE |
| 291.8 | AMH | 2:40AM |
| 291.3 | SSS | BLISTERING PEELING CONCRETE |
| 126.7 | MWL | — |
| 68.4 | SSS | PEELING CONCRETE |
| 78.8 | DSZ | SLUDGE INDUSTRIAL WASTE |
| 291.3 | MGO | MAG COAT 98% FINISH |
| 0 | MWM | — |
| 133.4 | SSS | BLISTERING CONCRETE |