Wastewater/Activity/PacpInspection/1.0May 15, 2018, 08:56 AM
  • B 0012_B 0011_15052018_024748.mp4

Date
05/15/2018
W/O
701684
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00072
PipeID
P08522
Time
1:56 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5669
Sewer Name
B JOINT OUTFALL B - UNIT 1A
City
CARSON
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
14
Purpose
Routine Assessment
Project
WO_701684_TV30071_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
144 in.
Width
144 in.
Upstream MH
B 0012
Downstream MH
B 0011
Dir. of Survey
Downstream
Length Surveyed
1010.3 ft.
Total Length
1010.3 ft.
Structural Index
4
Structural Quick
5d3i
Structural Rating
1559
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
1559
Pipe schematic from manhole B 0012 to B 0011
MH: B 0012MH: B 0011downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 00120 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area26.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.3 ft. MGO - General Observation - MAG COAT75.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start446.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"953.9 ft. SRP - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start1010.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish1010.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1010.3 ft. AMH - Downstream Manhole, Survey Ends - B 00111010.3 ft. SRP - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    26.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    75.3 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    953.9 ft. - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

Observations (12)

DistanceCodeObservation
26.3SAP
446.4TF
1010.2SRV
953.9SRP
1010.3AMHB 0011
0AMHB 0012
1010.2SAP
26.3MGOMAG COAT
0MWL
1010.3SRP
75.3SRV
0MWM

Properties (5)

additional_info
SC359326
custom_field_two
3
customer
LACSD
datetime
2018-05-15T01:56:19-07:00
year_laid
36930