Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 15, 2018, 09:47 AM
  • B 0011_B 0010_15052018_031721.mp4

Date
05/15/2018
W/O
701684
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00072
PipeID
P08521
Time
2:47 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5669
Sewer Name
B JOINT OUTFALL B - UNIT 1A
City
CARSON
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
14
Purpose
Routine Assessment
Project
WO_701684_TV30071_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
144 in.
Width
144 in.
Upstream MH
B 0011
Downstream MH
B 0010
Dir. of Survey
Downstream
Length Surveyed
531.8 ft.
Total Length
531.8 ft.
Structural Index
4
Structural Quick
5T3\
Structural Rating
971
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
971
Pipe schematic from manhole B 0011 to B 0010
MH: B 0011MH: B 0010downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 00112.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start2.1 ft. SRP - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start158.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"206.6 ft. SRP - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish531.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish531.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish531.8 ft. AMH - Downstream Manhole, Survey Ends - B 0010

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

Observations (11)

DistanceCodeObservation
0MWL
0MWM
2.1SAP
2.1SRP
2.1SRV
158.4TFA
0AMHB 0011
531.8SAP
531.7SRV
206.6SRP
531.8AMHB 0010

Properties (5)

additional_info
SC359326
custom_field_two
1
customer
LACSD
datetime
2018-05-15T02:47:56-07:00
year_laid
36930