C 0376_C 0375 _10052018_000810.mp4
2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
24.5 ft. - Infiltration Runner, at 08 o'clock, within 8 inches of joint: NO
191.8 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
210.4 ft. - Infiltration Runner, at 04 o'clock, within 8 inches of joint: NO
306.3 ft. - Infiltration Runner, at 08 o'clock, within 8 inches of joint: NO
318.8 ft. - Infiltration Dripper, at 08 o'clock, within 8 inches of joint: NO
| Distance | Code | Observation |
|---|---|---|
| 24.5 | IR | — |
| 318.8 | ID | — |
| 0 | MWL | — |
| 210.4 | IR | — |
| 0 | AMH | C 0376 |
| 51.1 | SRV | — |
| 226 | SRV | — |
| 361.8 | AMH | C 0375 ZOOMED IN |
| 187.7 | TFA | — |
| 2.1 | SRV | — |
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 2.1 | SAP | — |
| 191.8 | SRV | — |
| 0 | MWM | — |
| 360.4 | SAP | — |
| 306.3 | IR | — |
| 361.8 | MGO | CONNECTION AT MH 3 O'CLOCK |