Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2018, 06:45 PM
  • 18 0429_18 0428 _08052018_014907.mp4

Date
04/27/2018
W/O
701393
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00675
PipeID
P14277
Time
11:45 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5314
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
WO_701393_TV18097_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0429
Downstream MH
18 0428
Dir. of Survey
Downstream
Length Surveyed
449.1 ft.
Total Length
449.1 ft.
Structural Index
4
Structural Quick
5131
Structural Rating
8
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 18 0429 to 18 0428
MH: 18 0429MH: 18 0428downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 04297.2 ft. MGO - General Observation - MAGNEZIUM H.O COATING start43.7 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES77.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start210.1 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start247.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"299.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"348 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"397.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"437.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"449.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish449.1 ft. DSF - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish449.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0428

Observation photos (3)

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES

    43.7 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    77.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Fine,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    210.1 ft. - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
348TFC
247.1TFC
77.8SAP
7.2MGOMAGNEZIUM H.O COATING start
0MWM
437.5TFC
397.3TFC
0MWL
210.1DSF
449.1SAP
43.7SRV
299.7TFC
0AMH18 0429
449.1DSF
449.1AMH18 0428

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-04-27T11:45:39-07:00