18 0432_18 0431 _08052018_001544.mp4
6 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
8 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
30.2 ft. - General Observation - MAGNEZIUM H.O COATING start
40.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
198.3 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES
206 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 8 | DSZ | — |
| 432.6 | TFC | — |
| 380.6 | TFC | — |
| 451.7 | SAP | — |
| 178.9 | TFC | — |
| 30.2 | MGO | MAGNEZIUM H.O COATING start |
| 150 | TFC | — |
| 332.1 | TF | — |
| 283.6 | TFC | — |
| 451.7 | MGO | MAGNEZIUM H.O COATING finish |
| 227.3 | TF | — |
| 6 | SRV | — |
| 198.3 | SAP | — |
| 203.1 | TFA | — |
| 454.9 | AMH | 18 0431 |
| 247.5 | DSZ | — |
| 77.7 | TFC | — |
| 24.5 | TFA | — |
| 454.9 | MGO | SERVICE CONNECTION AT 3 O' CLOCK AT MH |
| 40.3 | SAP | — |
| 0 | MWL | — |
| 101.6 | TFC | — |
| 53.3 | TFC | — |
| 0 | MWM | — |
| 126.3 | TFC | — |
| 6 | TFA | — |
| 40.3 | SRV | — |
| 198.3 | SRV | — |
| 206 | SAP | — |
| 0 | AMH | 18 0432 |
| 251.4 | TFC | — |