Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2018, 07:58 AM
  • C 0619_C 0121_10052018_012014.mp4

Date
05/10/2018
W/O
701391
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00127
PipeID
P09645
Time
12:58 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5664
Sewer Name
C JOINT OUTFALL C - UNIT 4B
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
20
Purpose
Routine Assessment
Project
WO_701391_TV03143_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
C 0619
Downstream MH
C 0121
Dir. of Survey
Downstream
Length Surveyed
572.9 ft.
Total Length
572.9 ft.
Structural Index
4
Structural Quick
5V3V
Structural Rating
915
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
915
Pipe schematic from manhole C 0619 to C 0121
MH: C 0619MH: C 0121downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 06192.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.3 ft. SRP - Surface Reinforcement Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES175.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"424.9 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"571.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish572.9 ft. AMH - Downstream Manhole, Survey Ends - C 0121572.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES

    30.3 ft. - Surface Reinforcement Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES

Observations (12)

DistanceCodeObservation
30.3SRP
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
424.9TFA
572.9AMHC 0121
0MWM
572.9SAP
0AMHC 0619
175.6TF
2.1SAP
571.1SRV
2.1SRV

Properties (4)

additional_info
SC359320
custom_field_two
1
customer
LACSD
datetime
2018-05-10T00:58:22-07:00