Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2018, 06:44 PM
  • 18 0765_18 0764 _09052018_220308.mp4

Date
04/27/2018
W/O
701388
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00706
PipeID
P14624
Time
11:44 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5316
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
WO_701388_TV18103_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0765
Downstream MH
18 0764
Dir. of Survey
Downstream
Length Surveyed
290.6 ft.
Total Length
290.6 ft.
Structural Index
3
Structural Quick
3U00
Structural Rating
336
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
336
Pipe schematic from manhole 18 0765 to 18 0764
MH: 18 0765MH: 18 0764downstream0 ft. MGO - General Observation - CAPPED CONNECTION AT 9 O' CLOCK AT0 ft. MWL - Water Level, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07650 ft. MGO - General Observation - CAPPED CONNECTION AT 3 O' CLOCK AT MH0 ft. MWM - Water Mark, 45 %of cross sectional area2 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - VISIBLE/PROJECTING9.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start10 ft. MGO - General Observation - MAGNEZIUM H.O COATING start170.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"201.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"204.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"286 ft. SRP - Surface Reinforcement Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - VISIBLE/PROJECTING286.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish286.6 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish290.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0764

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING start

    10 ft. - General Observation - MAGNEZIUM H.O COATING start

Observations (15)

DistanceCodeObservation
9.9SAP
286SRPVISIBLE/PROJECTING
0MGOCAPPED CONNECTION AT 9 O' CLOCK AT
204.2TFA
2SRPVISIBLE/PROJECTING
0MWL
286.3SAP
0AMH18 0765
201.4TFA
10MGOMAGNEZIUM H.O COATING start
0MGOCAPPED CONNECTION AT 3 O' CLOCK AT MH
0MWM
286.6MGOMAGNEZIUM H.O COATING finish
290.6AMH18 0764
170.8TFA

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-04-27T11:44:35-07:00