Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2018, 08:40 AM
  • 18 0730_18 0729 _09052018_014927.mp4

Date
05/09/2018
W/O
701388
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00706
PipeID
P14583
Time
1:40 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5315
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_701388_TV18103_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0730
Downstream MH
18 0729
Dir. of Survey
Downstream
Length Surveyed
310.8 ft.
Total Length
310.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 18 0730 to 18 0729
MH: 18 0730MH: 18 0729downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07300 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. MGO - General Observation - CAPPED CONNECTION AT 3 O' CLOCK AT MH2.3 ft. MGO - General Observation - MAGNEZIUM H.O COATING start12.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start110.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"270.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"306.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish306.3 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish310.7 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH310.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0729

Observation photos (2)

  • General Observation - MAGNEZIUM H.O COATING start

    2.3 ft. - General Observation - MAGNEZIUM H.O COATING start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    12.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MWL
0AMH18 0730
310.8AMH18 0729
12.8SAP
306.3MGOMAGNEZIUM H.O COATING finish
0MWM
110.3TFA
306.2SAP
2.3MGOMAGNEZIUM H.O COATING start
270.5TFA
0MGOCAPPED CONNECTION AT 3 O' CLOCK AT MH
310.7MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-05-09T01:40:26-07:00