Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2018, 09:25 AM
  • 02 1407_02 1406 _09052018_023552.mp4

Date
05/09/2018
W/O
701119
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00349
PipeID
P02978
Time
2:25 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5661
Sewer Name
02 DISTRICT #2 INTERCEPTOR TRUNK
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
20
Purpose
Routine Assessment
Project
WO_701119_TV02220_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
02 1407
Downstream MH
02 1406
Dir. of Survey
Downstream
Length Surveyed
177.9 ft.
Total Length
177.9 ft.
Structural Index
4
Structural Quick
5F3F
Structural Rating
286
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
286
Pipe schematic from manhole 02 1407 to 02 1406
MH: 02 1407MH: 02 1406downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 14070 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start168.4 ft. SRP - Surface Reinforcement Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO, Start177.9 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish177.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish177.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK177.9 ft. SRP - Surface Reinforcement Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO, Finish177.9 ft. AMH - Downstream Manhole, Survey Ends - 02 1406

Observation photos (3)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO, Start

    168.4 ft. - Surface Reinforcement Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO, Start

Observations (12)

DistanceCodeObservation
0MWM
177.9SRV
0MWL
177.9SAP
168.4SRP
177.9MGOCONNECTION AT MH 9 O'CLOCK
2.1SRV
177.9SRP
2.1SAP
0AMH02 1407
177.9AMH02 1406
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (4)

additional_info
SC359317
custom_field_two
2
customer
LACSD
datetime
2018-05-09T02:25:57-07:00