Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 22, 2018, 05:28 AM
  • 18 0276_18 0275 _21052018_224148.mp4

Date
05/21/2018
W/O
701118
Weather
Dry
Operator/Surveyor
K. ADAME
Sewer ID
Z00702
PipeID
P14104
Time
10:28 PM
Certificate
U-0817-07009000
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5615
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
WO_701118_TV18148_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0276
Downstream MH
18 0275
Dir. of Survey
Downstream
Length Surveyed
209.2 ft.
Total Length
209.2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 18 0276 to 18 0275
MH: 18 0276MH: 18 0275downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 02762.1 ft. MGO - General Observation - MAGNESIUM COATING START7.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"30.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"76.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"79.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"128.1 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"128.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"131.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"176.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"179.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"207.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish207.2 ft. MGO - General Observation - MAGNESIUM COATING END209.2 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK209.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0275

Observation photos (2)

  • General Observation - MAGNESIUM COATING START

    2.1 ft. - General Observation - MAGNESIUM COATING START

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
7.2SAV
209.2MGOCONNECTION AT MH 3 OCLOCK
27.9TFC
176.4TFC
131.1TFC
207.2SAV
30.9TFC
128.1TB
179.6TFC
76.6TFC
79.5TF
0MWL
0MWM
2.1MGOMAGNESIUM COATING START
207.2MGOMAGNESIUM COATING END
128.1TFC
0AMH18 0276
209.2AMH18 0275

Properties (4)

additional_info
SC359170
custom_field_two
3
customer
LACSD
datetime
2018-05-21T22:28:58-07:00