C 0386_C 0385_01052018_033341.mp4
2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
6.5 ft. - Infiltration Weeper, from 07 to 09 o'clock, within 8 inches of joint: YES
25 ft. - Infiltration Stain, from 07 to 05 o'clock, within 8 inches of joint: YES
307.2 ft. - Surface Reinforcement Visible, from 03 to 05 o'clock, within 8 inches of joint: NO
339.7 ft. - Surface Reinforcement Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
402.7 ft. - Infiltration Runner, at 09 o'clock, within 8 inches of joint: NO
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 406.7 | SSS | — |
| 406.7 | SAP | — |
| 406.7 | SRV | — |
| 0 | MWM | — |
| 6.5 | IW | — |
| 2.2 | SSS | — |
| 185.9 | TFA | — |
| 339.7 | SRV | — |
| 408.2 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 402.7 | IR | — |
| 307.2 | SRV | — |
| 0 | AMH | C 0386 |
| 88.6 | TF | — |
| 408.3 | AMH | C 0385 |
| 68 | TFA | — |
| 2.2 | MGO | MAG COAT |
| 2.1 | SAP | — |
| 25 | IS | — |