Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 31, 2018, 08:24 AM
  • C 0216A_C 0614_5312018_034619.mp4

Date
05/31/2018
W/O
0706820
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P22936
Time
1:24 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0875
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20180531MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0216A
Downstream MH
C 0614
Dir. of Survey
Downstream
Length Surveyed
51.8 ft.
Total Length
51.8 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole C 0216A to C 0614
MH: C 0216AMH: C 0614downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:10AM0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 80% START 9:00 TO 3:002 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE6.7 ft. MGO - General Observation - SLIM COAT ON PIPE FROM HOT SEWAGE51.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE51.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active51.2 ft. MGO - General Observation - MAG COAT 80% FINISH51.8 ft. AMH - Downstream Manhole, Survey Ends - 3:20AM

Observation photos (3)

  • General Observation - MAG COAT 80% START 9:00 TO 3:00

    2 ft. - General Observation - MAG COAT 80% START 9:00 TO 3:00

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - SLIM COAT ON PIPE FROM HOT SEWAGE

    6.7 ft. - General Observation - SLIM COAT ON PIPE FROM HOT SEWAGE

Observations (12)

DistanceCodeObservation
51.2SSSBLISTERING PEELING CONCRETE
51.8AMH3:20AM
6.7MGOSLIM COAT ON PIPE FROM HOT SEWAGE
2MGOMAG COAT 80% START 9:00 TO 3:00
0MGOConn. @ Mh, 3 O' Clock. Active
0MWL
51.2MGOConn. @ Mh, 9 O' Clock. Active
0AMH3:10AM
0MGOConn. @ Mh, 9 O' Clock. Active
0MWM
51.2MGOMAG COAT 80% FINISH
2SSSBLISTERING PEELING CONCRETE

Properties (4)

custom_field_three
BLISTERING PEELING CONCRETE- 80% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2018-05-31T01:24:52-07:00