A 0396_A 0395_5252018_025354.mp4
8 ft. - General Observation - OLD MAG COAT 10% START
309.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCETE
309.4 ft. - Material Change, Reinforced concrete pipe
315 ft. - General Observation - MAG COAT 50% START
334.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING BLISTERING CONCRETE
353.7 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO, Start - POSSIBLE CIRCUM REBAR UNDER MAG COAT
374.4 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - POSIBLE CIRCUM REBAR
403.9 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVCERE AGG
468.7 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - POSSIBLE CIRCUM REBAR
513.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR UNDER MAG COAT
| Distance | Code | Observation |
|---|---|---|
| 468.7 | SRV | POSSIBLE CIRCUM REBAR |
| 0 | MWM | — |
| 535.5 | SSS | BLISTERING PEELING CONCRETE |
| 403.9 | SAV | SEVCERE AGG |
| 315 | MGO | MAG COAT 50% START |
| 0 | MWL | — |
| 536 | AMH | 3:50AM |
| 535.5 | MGO | MAG COAT 50% FINISH |
| 309.4 | SSS | BLISTERING PEELING CONCETE |
| 374.4 | SRV | POSIBLE CIRCUM REBAR |
| 535.5 | SAM | SEVERE AGG POSSIBLE UNDER MAG COAT |
| 353.7 | SRV | POSSIBLE CIRCUM REBAR UNDER MAG COAT |
| 0 | AMH | 2:50AM |
| 513.9 | SRV | CIRCUM REBAR UNDER MAG COAT |
| 353.7 | SAM | SEVERE AGG POSSIBLE UNDER MAG COAT |
| 334.3 | SSS | PEELING BLISTERING CONCRETE |
| 309.4 | MMC | — |
| 8 | MGO | OLD MAG COAT 10% START |
| 535.5 | SRV | POSSIBLE CIRCUM REBAR UNDER MAG COAT |