02 0771_02 0770_20160722_035646.mp4
0 ft. - Water Mark, 25 %of cross sectional area
3.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
56.9 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
56.9 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES
154.8 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES
261.2 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
268.9 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start
282.5 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4"
305.3 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 282.5 | TF | — |
| 282.5 | DAGS | — |
| 313.8 | DAGS | — |
| 0 | MGO | CONNECTION AT THE MH 3 O'CLOCK ACTIVE |
| 109.1 | TFC | — |
| 0 | MWL | — |
| 5.2 | TFC | — |
| 56.9 | TBA | — |
| 268.9 | DAGS | — |
| 261.2 | TFA | — |
| 3.1 | DAGS | — |
| 213 | TFC | — |
| 155.7 | TFC | — |
| 0 | MWM | — |
| 58.2 | TBA | — |
| 315 | AMH | 02 0770 |
| 305.3 | CL | — |
| 154.8 | CL | — |
| 0 | AMH | 02 0771 |
| 56.9 | DAGS | — |