0 ft. - General Observation - CONNECTION AT THE MH 9 O'CLOCK ACTIVE
0 ft. - Water Level, 5 %of cross sectional area
3.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
4.2 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
89.1 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"
101.6 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
130.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish
132.1 ft. - Upstream Manhole, Survey Ends - 02 0730
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 02 0729A |
| 0 | MGO | CONNECTION AT THE MH 9 O'CLOCK ACTIVE |
| 101.6 | TBA | — |
| 3.1 | DAGS | — |
| 100.1 | TFC | — |
| 132.1 | MGO | DAMGAGE OF TROUGH |
| 132.1 | AMH | 02 0730 |
| 0 | MWM | — |
| 89.1 | TBA | — |
| 4.2 | TFA | — |
| 130.1 | DAGS | — |
| 87.8 | TFC | — |
| 0 | MWL | — |