Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 25, 2016, 08:45 AM
Date
07/25/2016
W/O
574316
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00294
PipeID
P03281
Time
1:45 AM
Certificate
U-507-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3661
Sewer Name
02 OLD RIVER SCHOOL ROAD TRUNK, SECTS 1&2
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
26
Purpose
Routine Assessment
Project
WO_574316_TV02111_JUNE2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0727
Downstream MH
02 0726
Dir. of Survey
Downstream
Length Surveyed
352.4 ft.
Total Length
352.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 02 0727 to 02 0726
MH: 02 0727MH: 02 0726downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 02 07260 ft. MWM - Water Mark, 20 %of cross sectional area9.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start21.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"24.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"58.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"115 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"135.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"210.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"213.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"264.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4"305.2 ft. TFB - Tap Factory Made Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 4"307.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"349.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish352.4 ft. AMH - Downstream Manhole, Survey Ends - 02 0726

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    9.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"

    24.4 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"

  • Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"

    115 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"

    135.8 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"

Observations (17)

DistanceCodeObservation
264.1TB
307.7TFC
349.6DAGS
0MWL
115TFA
0MGOCONNECTION AT THE MH 3 O'CLOCK ACTIVE
305.2TFB
21.5TFA
58.2TBA
0AMH02 0726
352.4AMH02 0726
24.4TFC
210.9TFA
9.8DAGS
0MWM
135.8TF
213.6TF

Properties (4)

additional_info
SC305540
custom_field_two
4
customer
LACSD
datetime
2016-07-25T01:45:00-07:00