Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2016, 04:40 PM
  • H 0933_H 0932_20160217_095249.mp4

Date
02/17/2016
W/O
552579
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z01005
PipeID
P15346
Time
8:40 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3182
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
33
Purpose
Routine Assessment
Project
WO_552579_TV21022_FEB2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
H 0933
Downstream MH
H 0932
Dir. of Survey
Downstream
Length Surveyed
477.6 ft.
Total Length
477.6 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole H 0933 to H 0932
MH: H 0933MH: H 0932downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 09330 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. MGO - General Observation - MAGNEZIUM H.O COATING 50% start36.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start476 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish476 ft. MGO - General Observation - MAGNEZIUM H.O COATING 50% finish477.6 ft. AMH - Downstream Manhole, Survey Ends - H 0932

Observation photos (1)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    36.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
2MGOMAGNEZIUM H.O COATING 50% start
36.8SSS
476SSS
0AMHH 0933
0MWL
476MGOMAGNEZIUM H.O COATING 50% finish
477.6AMHH 0932
0MWM

Properties (4)

additional_info
SC224997
custom_field_two
4
customer
LACSD
datetime
2016-02-17T08:40:55-08:00