Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 11, 2018, 09:35 AM
  • 01 0984_01 0983_5112018_025807.mp4

Date
05/11/2018
W/O
0705547
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00228
PipeID
P01822
Time
2:35 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0853
Sewer Name
01 WRIGHT ROAD TRUNK
City
MAYWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
02
Purpose
Routine Assessment
Project
20180511MDM_WRIGHT_ROAD_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
01 0983
Downstream MH
01 0984
Dir. of Survey
Upstream
Length Surveyed
225.9 ft.
Total Length
225.9 ft.
Structural Index
2
Structural Quick
3224
Structural Rating
14
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 01 0983 to 01 0984
MH: 01 0983MH: 01 0984upstream0 ft. AMH - Upstream Manhole, Survey Ends - 3:25AM0.3 ft. MGO - General Observation - MH CONN 9:00 ACTIVE34.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open43.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open52.1 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES - H64.9 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES - H90.9 ft. FC - Fracture Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES - H100.5 ft. FC - Fracture Circumferential, from 12 to 01 o'clock, within 8 inches of joint: YES - H108.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open109.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open114.3 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES - H147.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open147.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open149.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open191.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open193.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open213.7 ft. FC - Fracture Circumferential, from 11 to 03 o'clock, within 8 inches of joint: YES - HAIRLINE217.9 ft. MGO - General Observation - 21" VCP=PIPE APPEARES AS 18" VCP225.9 ft. AMH - Downstream Manhole, Survey Begins - 3:05AM225.9 ft. MWM - Water Mark, 20 %of cross sectional area225.9 ft. MWL - Water Level, 5 %of cross sectional area

Observations (21)

DistanceCodeObservation
32TFOpen
78.5TBOpen
135FCH
117.7TFOpen
116.1TFOpen
111.6FLH
182.5TFOpen
225.6MGOMH CONN 9:00 ACTIVE
34.3TFOpen
8MGO21" VCP=PIPE APPEARES AS 18" VCP
0AMH3:05AM
225.9AMH3:25AM
191.2TFOpen
0MWM
161FLH
76.4TFOpen
125.4FCH
78.5TFOpen
0MWL
173.8FCH
12.2FCHAIRLINE

Properties (5)

additional_info
REVERSE INSPECTION
custom_field_three
HAIRLINE FRACTURES
custom_field_two
4
customer
LACSD
datetime
2018-05-11T02:35:04-07:00