Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 28, 2018, 08:50 AM
  • Section#2_18 0916_18 0915__4282018__G6990.mp4

Date
04/28/2018
W/O
0701634
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00709
PipeID
P14767
Time
1:50 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
G6990
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
SOUTH WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
20180428MDM_SO_WHITTIER_OUTFALL_RLF_TR_SECTS_1_2A_2B_2C_3
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
18 0916
Downstream MH
18 0915
Dir. of Survey
Downstream
Length Surveyed
239.8 ft.
Total Length
239.8 ft.
Structural Index
2
Structural Quick
3E2I
Structural Rating
189
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
189
Pipe schematic from manhole 18 0916 to 18 0915
MH: 18 0916MH: 18 0915downstream0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:25AM2 ft. MGO - General Observation - MAG COAT 80% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE68.2 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG68.2 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG95.8 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG95.8 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG142.7 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC157.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE168.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE239.3 ft. MGO - General Observation - MAG COAT 80% FINISH239.3 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC239.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE239.8 ft. AMH - Downstream Manhole, Survey Ends - 2:55AM

Observation photos (6)

  • General Observation - MAG COAT 80% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    68.2 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    68.2 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    142.7 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    168.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

Observations (17)

DistanceCodeObservation
2MGOMAG COAT 80% START 8:00 TO 4:00
142.7SAVSEVERE AGG SPORATIC
0MGOMH CONN 9:00 ACTIVE
0MWL
95.8SAPSEVERE AGG
68.2SAPSEVERE AGG
239.3MGOMAG COAT 80% FINISH
95.8SAPSEVERE AGG
2SSSBLISTERING PEELING CONCRETE
0MWM
239.3SAVSEVERE AGG SPORATIC
239.3SSSBLISTERING PEELING CONCRETE
0AMH2:25AM
239.8AMH2:55AM
68.2SAPSEVERE AGG
157.1TFACTIVE
168.3SSSBLISTERING CONCRETE

Properties (4)

custom_field_three
SEVERE AGG PROJECTING-80% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2018-04-28T01:50:00-07:00