2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, - CIRCUM REBAR POSSIBLE
2 ft. - General Observation - MAG COAT 60% START 9:00 TO 3:00
2 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES, - CIRCUM REBAR POSSIBLE
2 ft. - Surface Aggregate Missing, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Aggregate Missing, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
29.3 ft. - General Observation - MAG COAT 30% START
36.9 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
366 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
613.3 ft. - General Observation - MAG COAT 60% START
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 36.9 | SAP | SEVERE AGG SPORATIC |
| 2 | SRV | CIRCUM REBAR POSSIBLE |
| 0 | AMH | 2:35AM |
| 2 | MGO | MAG COAT 60% START 9:00 TO 3:00 |
| 0 | MWL | — |
| 2 | SRV | CIRCUM REBAR POSSIBLE |
| 0 | MWM | — |
| 29.3 | MGO | MAG COAT 30% START |
| 734.2 | SAM | SEVERE AGG |
| 54.3 | MGO | MAG G COAT 70% START |
| 613.3 | MGO | MAG COAT 60% START |
| 2 | SAM | SEVERE AGG |
| 734.9 | AMH | 3:35AM |
| 2 | SAM | SEVERE AGG |
| 734.2 | SSS | BLISTERING PEELING CONCRETE |
| 734.2 | SAM | SEVERE AGG |
| 734.2 | MGO | MAG COAT 60% FINISH |
| 366 | SSS | BLISTERING PEELING CONCRETE |
| 734.2 | SAP | SEVERE AGG VERY SPORATIC |