Wastewater/Activity/PacpInspection/1.0Jun 21, 2017, 10:25 AM
  • 15 0725_15 0724_6212017_041001.mp4

Date
06/21/2017
W/O
0640693
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00616
PipeID
P12618
Time
3:25 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0569
Sewer Name
15 MONROVIA OUTFALL TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20170621MDM_M0NROVIA_OUTFALL_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
15 0725
Downstream MH
15 0724
Dir. of Survey
Downstream
Length Surveyed
654.9 ft.
Total Length
654.9 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
15
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
15
Pipe schematic from manhole 15 0725 to 15 0724
MH: 15 0725MH: 15 0724downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:15AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 80% 8:00 TO 4:00 START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG421.9 ft. MGO - General Observation - 80% MAG COAT510.1 ft. SRV - Surface Reinforcement Visible, from 03 to 04 o'clock, within 8 inches of joint: YES - CIRCUM REBAE POSSIBLE532 ft. MGO - General Observation - 90% MAG COAT607.9 ft. SRC - Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: NO - CIRCUM REBAR POSSIBLE654.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERNG PEELING CONCRETE654.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG654.5 ft. MGO - General Observation - MAG COAT 80% FINISH654.5 ft. MGO - General Observation - Conn. @ Mh, 8 O' Clock. OPEN654.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active654.9 ft. AMH - Downstream Manhole, Survey Ends - 5:00AM

Observation photos (6)

  • General Observation - MAG COAT 80% 8:00 TO 4:00 START

    2 ft. - General Observation - MAG COAT 80% 8:00 TO 4:00 START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - 80% MAG COAT

    421.9 ft. - General Observation - 80% MAG COAT

  • General Observation - 90% MAG COAT

    532 ft. - General Observation - 90% MAG COAT

  • Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: NO - CIRCUM REBAR POSSIBLE

    607.9 ft. - Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: NO - CIRCUM REBAR POSSIBLE

Observations (16)

DistanceCodeObservation
510.1SRVCIRCUM REBAE POSSIBLE
0MWM
0AMH4:15AM
654.5SSSBLISTERNG PEELING CONCRETE
654.5SAPSEVERE AGG
421.9MGO80% MAG COAT
654.5MGOMAG COAT 80% FINISH
654.9AMH5:00AM
654.5MGOConn. @ Mh, 8 O' Clock. OPEN
2MGOMAG COAT 80% 8:00 TO 4:00 START
532MGO90% MAG COAT
654.5MGOConn. @ Mh, 9 O' Clock. Active
2SSSBLISTERING PEELING CONCRETE
2SAPSEVERE AGG
0MWL
607.9SRCCIRCUM REBAR POSSIBLE

Properties (4)

custom_field_three
CIRCUM SUFACE REBAR CORRODED POSSIBLE
custom_field_two
2
customer
LACSD
datetime
2017-06-21T03:25:00-07:00