Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 8, 2016, 10:40 AM
  • 29 0840_29 0739_1182016_030319.mp4

Date
11/08/2016
W/O
0597283
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01090
PipeID
P24660
Time
2:40 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0338
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20161108MDM_ALAMITOS_PUMPING_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0739
Downstream MH
29 0840
Dir. of Survey
Upstream
Length Surveyed
263.5 ft.
Total Length
263.5 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 29 0739 to 29 0840
MH: 29 0739MH: 29 0840upstream0 ft. AMH - Upstream Manhole, Survey Ends - 3:50AM0.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6" - Active2.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Capped28.6 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open50.7 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6" - Open84.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Capped100.8 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - SLIGHT100.8 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area101.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 6" - Capped103.8 ft. MGP - General Photograph104.7 ft. RPZ - Repair Other, within 8 inches of joint: YES - REPAIR SECTION POSSIBLE149.9 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6" - Open182.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Capped228.3 ft. MGO - General Observation - 8" VCP232.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 6" - Capped234 ft. FC - Fracture Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES - HAIRLINE263.5 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active IINCOMING263.5 ft. MWL - Water Level, 10 %of cross sectional area263.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active OUTGOING263.5 ft. MWM - Water Mark, 20 %of cross sectional area263.5 ft. AMH - Downstream Manhole, Survey Begins - 2:55AM

Observation photos (3)

  • General Observation - 8" VCP

    35.2 ft. - General Observation - 8" VCP

  • Repair Other, within 8 inches of joint: YES - REPAIR SECTION POSSIBLE

    158.8 ft. - Repair Other, within 8 inches of joint: YES - REPAIR SECTION POSSIBLE

  • General Photograph

    159.7 ft. - General Photograph

Observations (21)

DistanceCodeObservation
0MGOConn. @ Mh, 3 O' Clock. Active IINCOMING
162.7FCSLIGHT
0MWL
0MGOConn. @ Mh, 9 O' Clock. Active OUTGOING
234.9TBOpen
29.5FCHAIRLINE
0MWM
113.6TFOpen
263.5AMH3:50AM
260.7TFCCapped
212.8TBOpen
35.2MGO8" VCP
31TFCCapped
80.7TFCCapped
263TFActive
179.4TFCCapped
161.7TFCCapped
159.7MGP
162.7MWLS
158.8RPZREPAIR SECTION POSSIBLE
0AMH2:55AM

Properties (4)

custom_field_three
SLIGHT SAG REPAIR AREA
custom_field_two
3
customer
LACSD
datetime
2016-11-08T02:40:20-08:00