Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 17, 2018, 10:43 AM
  • 05 0947_05 0125 _17042018_040447.mp4

Date
04/17/2018
W/O
696327
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00481
PipeID
P06179
Time
3:43 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5532
Sewer Name
05 MANCHESTER AVENUE PUMP TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Project
WO_696327_TV05335_APR2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
05 0947
Downstream MH
05 0125
Dir. of Survey
Downstream
Length Surveyed
439.8 ft.
Total Length
439.8 ft.
Structural Index
3
Structural Quick
3P00
Structural Rating
255
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
255
Pipe schematic from manhole 05 0947 to 05 0125
MH: 05 0947MH: 05 0125downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 09470 ft. MGO - General Observation - HEAVY STEAM IN PIPE13.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"78.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"130.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"179.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"232.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"281.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"330.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"383.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"439 ft. MGO - General Observation - Slight Grease throughout the reach, 3 to 9 oclock, 5%439 ft. MGO - General Observation - Surface Spalling throughout the reach, 9 to 3 oclock.439.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish439.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK439.8 ft. AMH - Downstream Manhole, Survey Ends - 05 0125

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
130.7TFC
13.2CM
232.2TFC
281.3TFC
0MWL
0MWM
439MGOSlight Grease throughout the reach, 3 to 9 oclock, 5%
439.1CM
439MGOSurface Spalling throughout the reach, 9 to 3 oclock.
439.8AMH05 0125
31TFC
0AMH05 0947
383.1TFC
0MGOHEAVY STEAM IN PIPE
179.8TFC
439.7MGOCONNECTION AT MH 3 O'CLOCK
78.1TFC
330.7TFC

Properties (4)

additional_info
SC358740
custom_field_two
3
customer
LACSD
datetime
2018-04-17T03:43:17-07:00