Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 2, 2018, 11:27 AM
  • 18 0919_18 0399 _02042018_044034.mp4

Date
04/02/2018
W/O
690550
Weather
Light Rain
Operator/Surveyor
B.FUGATE
Sewer ID
Z00699
PipeID
P14233
Time
4:27 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5516
Sewer Name
18 SANTA FE STREET RELIEF TRUNK
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
WO_690550_TV18173_MAR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0919
Downstream MH
18 0399
Dir. of Survey
Downstream
Length Surveyed
323.7 ft.
Total Length
323.7 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
192
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
192
Pipe schematic from manhole 18 0919 to 18 0399
MH: 18 0919MH: 18 0399downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 18 09193 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"85.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"146.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"185 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"186.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"291.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"323 ft. MGO - General Observation - Surface Spalling throughout the reach from 7 to 5 oclock.323.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish323.7 ft. AMH - Downstream Manhole, Survey Ends - 18 0399

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
323MGOSurface Spalling throughout the reach from 7 to 5 oclock.
0MWL
86.8TF
6.6TF
291.7TF
0MWM
186.8TF
85.9TF
323.7AMH18 0399
146.7TF
196.9TF
3SAP
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
323.6SAP
185TF
0AMH18 0919

Properties (4)

additional_info
SC358722
custom_field_two
2
customer
LACSD
datetime
2018-04-02T04:27:50-07:00