Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 28, 2017, 02:25 PM
  • 19 0185_19 0184_10282017_074848.mp4

  • 19 0185_19 0184_10282017_094813.mp4

Date
10/28/2017
W/O
0650319
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00719
PipeID
P15154
Time
7:25 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
G7547
Sewer Name
19 CERRITOS TRUNK
City
CERRITOS
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
05
Purpose
Maintenance Related
Project
20171028SHO_CERRITOS_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
19 0185
Downstream MH
19 0184
Dir. of Survey
Downstream
Length Surveyed
354.1 ft.
Total Length
354.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2D00
O&M Rating
48
Overall Index
2
Overall Quick
Overall Rating
48
Pipe schematic from manhole 19 0185 to 19 0184
MH: 19 0185MH: 19 0184downstream0 ft. AMH - Upstream Manhole, Survey Begins - 07500 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area30.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES42.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 04 o'clock, , within 8 inches of joint: YES66.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 12 o'clock, , within 8 inches of joint: YES91.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES117 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 03 o'clock, , within 8 inches of joint: YES122.3 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES135 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 03 o'clock, , within 8 inches of joint: YES141.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: YES146.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 10 to 04 o'clock, , within 8 inches of joint: YES153.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES183.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 01 o'clock, , within 8 inches of joint: YES189.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES207.1 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES225.6 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 03 o'clock, , within 8 inches of joint: YES251 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 03 o'clock, , within 8 inches of joint: YES257.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES263.7 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES281.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES293.8 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES300 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES305.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES317.5 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: YES324.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES342.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES354.1 ft. AMH - Downstream Manhole, Survey Ends - 1025

Observation photos (22)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: YES

    30.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 12 o'clock,  , within 8 inches of joint: YES

    66.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 12 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock,  , within 8 inches of joint: YES

    91.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 03 o'clock,  , within 8 inches of joint: YES

    117 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    122.3 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 03 o'clock,  , within 8 inches of joint: YES

    135 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 03 to 04 o'clock,  , within 8 inches of joint: YES

    141.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 10 to 04 o'clock,  , within 8 inches of joint: YES

    146.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 10 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    153.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 01 o'clock,  , within 8 inches of joint: YES

    183.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 01 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 12 o'clock,  , within 8 inches of joint: YES

    207.1 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 03 o'clock,  , within 8 inches of joint: YES

    225.6 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 03 o'clock,  , within 8 inches of joint: YES

    251 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    257.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: YES

    263.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: YES

    281.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock,  , within 8 inches of joint: YES

    293.8 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock,  , within 8 inches of joint: YES

    300 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    305.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Settled Compacted,  5 %of cross sectional area, from 02 to 03 o'clock,  , within 8 inches of joint: YES

    317.5 ft. - Deposits Settled Compacted, 5 %of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock,  , within 8 inches of joint: YES

    324.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    342.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

Observations (28)

DistanceCodeObservation
293.8DAE
141.2DAE
342.9DAE
146.5DAE
183.4DAE
305.8DAE
300DAE
317.5DSC
257.2DAE
122.3DAE
0AMH0750
251DAE
324.1DAE
354.1AMH1025
42.5DAE
0MWL
0MWM
263.7DAE
91.3DAE
66.8DAE
153.3DAE
135DAE
207.1DAE
225.6DAE
189.3DAE
117DAE
281.4DAE
30.8DAE

Properties (5)

additional_info
TELEVISING CALCIUM REMOVAL
custom_field_three
CALCIUM REMOVAL
custom_field_two
5
customer
LACSD
datetime
2017-10-28T07:25:43-07:00