C 0311A_C 0311_6222017_110145.mp4
8.1 ft. - General Observation - MAG COAT, FROM 8 TO 4 OCLOCK, 50%
8.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
8.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
27 ft. - General Photograph - EXPOSED AGGREGATE VISIBLE
157.5 ft. - General Photograph - PROJECTING AGGREGATE THROUGHOUT REACH
162.2 ft. - Downstream Manhole, Survey Ends - 11:20 AM
| Distance | Code | Observation |
|---|---|---|
| 120.6 | CM | — |
| 162.2 | AMH | 11:20 AM |
| 0 | MGO | ROACHES AT MH > 50 |
| 8.1 | MGO | MAG COAT, FROM 8 TO 4 OCLOCK, 50% |
| 0 | AMH | 11:00 AM |
| 157.5 | MGP | PROJECTING AGGREGATE THROUGHOUT REACH |
| 0 | MGO | CONNECTION AT MH, 9 OCLOCK, ACTIVE |
| 159 | DAGS | — |
| 27 | MGP | EXPOSED AGGREGATE VISIBLE |
| 0 | MWL | — |
| 0 | MWM | — |
| 8.1 | SAP | — |
| 162.2 | MGO | CONNECTION AT MH, 9 OCLOCK, ACTIVE |
| 0 | MGO | CONNECTION AT MH, 3 OCLOCK, ACTIVE |
| 159 | SSS | — |
| 8.1 | DAGS | — |
| 159 | SAP | — |
| 8.1 | SSS | — |