Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 11, 2016, 07:49 AM
  • C 0619_C 0121_20160511_012551.mp4

Date
05/11/2016
W/O
568758
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00127
PipeID
P09645
Time
12:49 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3370
Sewer Name
C JOINT OUTFALL C - UNIT 4B
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_568758_TV03143_MAY2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
C 0619
Downstream MH
C 0121
Dir. of Survey
Downstream
Length Surveyed
578.2 ft.
Total Length
578.2 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
13
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
13
Pipe schematic from manhole C 0619 to C 0121
MH: C 0619MH: C 0121downstream0 ft. AMH - Upstream Manhole, Survey Begins - C 06190 ft. MGO - General Observation - CONNECTION AT MH 6 OCLOCK0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK8.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start15.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start38.2 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO, Start179.9 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"435.7 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 8"571.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish571.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish573.6 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish578.2 ft. AMH - Downstream Manhole, Survey Ends - C 0121

Observation photos (4)

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    8.6 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    15.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    38.2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish

    571.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish

Observations (12)

DistanceCodeObservation
571.3SRV
15.6SAP
571.3SAP
0AMHC 0619
573.6SRC
8.6SRV
0MGOCONNECTION AT MH 6 OCLOCK
38.2SRC
179.9TF
435.7TFA
578.2AMHC 0121
0MGOCONNECTION AT MH 3 OCLOCK

Properties (4)

additional_info
SC300369
custom_field_two
2
customer
LACSD
datetime
2016-05-11T00:49:38-07:00