A 0248_C 0119A_522018_023213.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
9.5 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
12.8 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUM
15.2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG REBAR
17 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM BROKEN MISSING
17.6 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
36.7 ft. - Upstream Manhole, Survey Ends - 2:45AM STOPLOG IN PLACE
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | BLISTERING CONCRETE |
| 17.6 | SRC | CIRCUM REBAR |
| 15.2 | SRV | LONG REBAR |
| 2 | SAP | SEVERE AGG SPORATIC |
| 36 | SRC | CIRCUM REBAR |
| 12.8 | SRV | CIRCUM |
| 0 | MWM | — |
| 36 | SSS | BLISTERING CONCRETE |
| 36.7 | AMH | 2:45AM STOPLOG IN PLACE |
| 36 | SRV | CIRCUM REBAR |
| 36 | SAM | SEVERE AGG |
| 9.5 | SAM | SEVERE AGG |
| 9.5 | SAP | SEVERE AGGSPORATIC |
| 36 | SRV | LONG REBAR |
| 17 | SRC | CIRCUM BROKEN MISSING |
| 0 | AMH | 2:00AM |
| 0 | MWL | NO FLOW |
| 9.5 | MGO | 48" RCP |