Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 1, 2018, 12:15 PM
  • 18 0893_18 0892_512018_052244.mp4

Date
05/01/2018
W/O
0701634
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00709
PipeID
P14744
Time
5:15 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0848
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
SOUTH WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
20180501MDM_SO_WHITTIER_OUTFALL_RLF_TR_SECTS_1_2A_2B_2C_3
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
18 0893
Downstream MH
18 0892
Dir. of Survey
Downstream
Length Surveyed
210.7 ft.
Total Length
210.7 ft.
Structural Index
2
Structural Quick
3223
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 18 0893 to 18 0892
MH: 18 0893MH: 18 0892downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:20AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. MGO - General Observation - MAG COAT 90% START 8:00 TO 4:008 ft. MGO - General Observation - 27" RCP41.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE97.1 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG101.7 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG113.1 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG161.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE174 ft. MGO - General Observation - 100% MAG COAT210.2 ft. MGO - General Observation - MAG COAT 90% FINISH210.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE210.7 ft. AMH - Downstream Manhole, Survey Ends - 5:45AM

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - MAG COAT 90% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 90% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    41.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    97.1 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    101.7 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    161.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

  • General Observation - 100%  MAG COAT

    174 ft. - General Observation - 100% MAG COAT

Observations (15)

DistanceCodeObservation
2SSSBLISTERING PEELING CONCRETE
113.1SAVSEVERE AGG
97.1SAVSEVERE AGG
0MWM
161.5SSSBLISTERING CONCRETE
2MGOMAG COAT 90% START 8:00 TO 4:00
210.7AMH5:45AM
210.2MGOMAG COAT 90% FINISH
41.4SSSPEELING CONCRETE
0MWL
174MGO100% MAG COAT
0AMH5:20AM
101.7SAVSEVERE AGG
8MGO27" RCP
210.2SSSBLISTERING PEELING CONCRETE

Properties (4)

custom_field_three
VISIBLE SEVERE AGG -90% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2018-05-01T05:15:19-07:00