Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2016, 05:07 AM
  • 02 0397_02 0396 _20160811_231643.mp4

Date
08/11/2016
W/O
252431
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00250
PipeID
P02718
Time
10:07 PM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3681
Sewer Name
02 DOWNEY AVENUE EXTENSION TRUNK
City
PARAMOUNT, CA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
32
Purpose
Routine Assessment
Project
WO_252431_TV02049_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0397
Downstream MH
02 0396
Dir. of Survey
Downstream
Length Surveyed
166 ft.
Total Length
166 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 02 0397 to 02 0396
MH: 02 0397MH: 02 0396downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 03970 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK ACTIVE2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start21.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"27.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"74.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"79.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"121.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"127.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"162.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish166 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK ACTIVE166 ft. AMH - Downstream Manhole, Survey Ends - 02 0396

Observation photos (2)

  • Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"

    79.8 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    162.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observations (14)

DistanceCodeObservation
0AMH02 0397
121.4TFC
27.4TFC
166MGOCONNECTION AT THE MH 3 O'CLOCK ACTIVE
166AMH02 0396
2.9DAGS
74.5TFC
162.4DAGS
0MWM
79.8TFA
21.6TFC
0MWL
127.1TFC
0MGOCONNECTION AT THE MH 3 O'CLOCK ACTIVE

Properties (4)

additional_info
SC306011
custom_field_two
4
customer
LACSD
datetime
2016-08-11T22:07:00-07:00