Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 26, 2016, 07:35 AM
  • C 0369_C 0368_26042016_003613.mp4

Date
04/26/2016
W/O
563419
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00141
PipeID
P09832
Time
12:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3325
Sewer Name
C JOINT OUTFALL C - UNIT 8C
City
HAWAIIAN GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
WO_563419_TV19012_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
C 0369
Downstream MH
C 0368
Dir. of Survey
Downstream
Length Surveyed
28.5 ft.
Total Length
28.5 ft.
Structural Index
3
Structural Quick
3524
Structural Rating
23
O&M Index
2
O&M Quick
3425
O&M Rating
22
Overall Index
3
Overall Quick
Overall Rating
45
Pipe schematic from manhole C 0369 to C 0368
MH: C 0369MH: C 0368downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - C 03690 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start9.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start28.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish28.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK28.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish28.5 ft. AMH - Downstream Manhole, Survey Ends - C 036828.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish28.5 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
28.5DAGS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
28.5MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0AMHC 0369
2DAGS
0MGOCOCKROACHES IN MANHOLE
9.5SSS
28.5SSS
0MWM
2SAP
28.5AMHC 0368
28.5SAP
0MWL
28.5DSZ
6.2DSZ

Properties (5)

additional_info
SC305603
custom_field_two
2
customer
LACSD
datetime
2016-04-26T00:35:46-07:00
year_laid
19730406