Wastewater/Activity/PacpInspection/1.0Apr 22, 2016, 06:31 AM
  • C 0380_C 0379_21042016_233150.mp4

Date
04/21/2016
W/O
563419
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00141
PipeID
P09843
Time
11:31 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3323
Sewer Name
C JOINT OUTFALL C - UNIT 8C
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
WO_563419_TV19012_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
C 0380
Downstream MH
C 0379
Dir. of Survey
Downstream
Length Surveyed
511.9 ft.
Total Length
511.9 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
505
O&M Index
2
O&M Quick
413K
O&M Rating
383
Overall Index
2
Overall Quick
Overall Rating
888
Pipe schematic from manhole C 0380 to C 0379
MH: C 0380MH: C 0379downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 03802 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.9 ft. IR - Infiltration Runner, at 04 o'clock, within 8 inches of joint: YES215.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start509.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish509.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish509.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish509.3 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish511.9 ft. AMH - Downstream Manhole, Survey Ends - C 0379

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Runner, at 04 o'clock, within 8 inches of joint: YES

    6.9 ft. - Infiltration Runner, at 04 o'clock, within 8 inches of joint: YES

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    215.4 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
509.3DAGS
2DAGS
509.3SSS
0MWL
511.9AMHC 0379
0MWM
2SSS
509.3SAP
509.3DSZ
2SAP
0AMHC 0380
6.9IR
215.4DSZ

Properties (5)

additional_info
SC305601
custom_field_two
2
customer
LACSD
datetime
2016-04-21T23:31:10-07:00
year_laid
19730406