Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 22, 2016, 06:15 AM
  • C 0381_C 0380_21042016_231542.mp4

Date
04/21/2016
W/O
563419
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00141
PipeID
P09844
Time
11:15 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3323
Sewer Name
C JOINT OUTFALL C - UNIT 8C
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
WO_563419_TV19012_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
C 0381
Downstream MH
C 0380
Dir. of Survey
Downstream
Length Surveyed
334.5 ft.
Total Length
334.5 ft.
Structural Index
3
Structural Quick
3Y2L
Structural Rating
519
O&M Index
2
O&M Quick
412L
O&M Rating
136
Overall Index
3
Overall Quick
Overall Rating
655
Pipe schematic from manhole C 0381 to C 0380
MH: C 0381MH: C 0380downstream0 ft. AMH - Upstream Manhole, Survey Begins - C 03810 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start17.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start239.8 ft. IR - Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES332.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish332.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish332.5 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish332.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish334.5 ft. AMH - Downstream Manhole, Survey Ends - C 0380

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    17.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES

    239.8 ft. - Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES

Observations (13)

DistanceCodeObservation
2DAGS
0AMHC 0381
17.8SAP
0MWM
332.5SSS
239.8IR
334.5AMHC 0380
332.5DAGS
2SAV
332.5SAV
332.5SAP
0MWL
2SSS

Properties (5)

additional_info
SC305601
custom_field_two
2
customer
LACSD
datetime
2016-04-21T23:15:25-07:00
year_laid
19730406