Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 20, 2018, 03:23 PM
  • Section#2_03 0215_03 0214__4202018__G6989.mp4

Date
04/20/2018
W/O
0672783
Weather
Light Rain
Operator/Surveyor
FRANKLIN
Sewer ID
Z00387
PipeID
P04815
Time
8:23 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6989
Sewer Name
03 NORTH LONG BEACH TRUNK
City
LONG BEACH
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
10
Purpose
Routine Assessment
Project
20180419DF_NORTH_LONG_BEACH_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
30 in.
Upstream MH
03 0215
Downstream MH
03 0214
Dir. of Survey
Downstream
Length Surveyed
216.9 ft.
Total Length
216.9 ft.
Structural Index
2
Structural Quick
3H2H
Structural Rating
222
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
226
Pipe schematic from manhole 03 0215 to 03 0214
MH: 03 0215MH: 03 0214downstream0 ft. AMH - Upstream Manhole, Survey Begins - 8:24 AM0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES53.1 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES56.8 ft. CS - Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES64.8 ft. CM - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES99.7 ft. MGP - General Photograph102.7 ft. MGP - General Photograph156.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES184.4 ft. MGP - General Photograph214.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish215 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE215 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish216.9 ft. AMH - Downstream Manhole, Survey Ends - 9:23 AM

Observation photos (10)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    26.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    53.1 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES

    56.8 ft. - Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

    64.8 ft. - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    99.7 ft. - General Photograph

  • General Photograph

    102.7 ft. - General Photograph

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    156.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Photograph

    184.4 ft. - General Photograph

Observations (17)

DistanceCodeObservation
0AMH8:24 AM
0MWL
56.8CS
215MGOCONN @ MH 9 O'CLOCK/ACTIVE
64.8CM
2SSS
156.6DAGS
102.7MGP
99.7MGP
53.1CL
214.9CM
215SSS
216.9AMH9:23 AM
26.2DAGS
2CM
0MWM
184.4MGP

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-04-20T08:23:05-07:00