22 0625_22 0624_20160512_111315.mp4
0 ft. - Upstream Manhole, Survey Begins - 22 0625
2 ft. - General Observation - Magnesium hydroxide coating 95%start

7.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
27 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"
29.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - WANDERING
102 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
218.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 221.6 | MGO | CONNECTION AT THE MH 9 O'CLOCK |
| 7.2 | DAGS | — |
| 21.2 | TFC | — |
| 185.1 | TFC | — |
| 0 | AMH | 22 0625 |
| 2 | MGO | Magnesium hydroxide coating 95%start |
| 0 | MWL | — |
| 194.1 | TBA | — |
| 218.8 | DAGS | — |
| 221.6 | AMH | 22 0624 |
| 27 | TF | — |
| 102 | TFA | — |
| 218.8 | SAV | — |
| 29.2 | SAV | WANDERING |
| 221.6 | MGO | CONNECTION AT THE MH 3 O'CLOCK |
| 0 | MWM | — |
| 218.8 | MGO | Magnesium hydroxide coating finish |